
Junzhou Huo
Featured in:
mdpi.com
Articles
-
Sep 5, 2023 |
mdpi.com | Junzhou Huo |Bowen Yang |Zhen Wu |Guopeng Jia
4. Case StudyThe engineering data used in this paper come from the Xinjiang Yiner Water Supply Phase 2 Project, excavated mainly by the TBM construction method. The total length of the tunnel was 283.27 km, and the tunneling diameter of 7.03 m. According to the analysis of the engineering geological report, the stratum lithology that the tunnel passes through is greater, and the GECs include 2 to 5.
Try JournoFinder For Free
Search and contact over 1M+ journalist profiles, browse 100M+ articles, and unlock powerful PR tools.
Start Your 7-Day Free Trial →