
Mohammad Noori
Articles
-
Dec 15, 2024 |
mdpi.com | Mohammad Noori
3. Model Test Design 3.1. Overview of the Cable-Stayed Bridge SpecimenA 1/4 scale model was constructed to represent the engineering background of a double-tower concrete cable-stayed bridge. The main girder measures 3.425 m in length (1.175 + 1.200 + 1.050 m) and 0.400 m in width. The main cross-section is a girder with double steel boxes. At the joints of the steel box girder segments, connection steel plates were placed on both the inner and outer sides of the edge box girder.
-
Jun 3, 2024 |
mdpi.com | Peter Hunt |Mohammad Noori |Scott J. Hazelwood |Naudereh Noori
All articles published by MDPI are made immediately available worldwide under an open access license. No specialpermission is required to reuse all or part of the article published by MDPI, including figures and tables. Forarticles published under an open access Creative Common CC BY license, any part of the article may be reused withoutpermission provided that the original article is clearly cited. For more information, please refer tohttps://www.mdpi.com/openaccess.
Try JournoFinder For Free
Search and contact over 1M+ journalist profiles, browse 100M+ articles, and unlock powerful PR tools.
Start Your 7-Day Free Trial →