
Robert Hofmann
Articles
-
Aug 12, 2024 |
onlinelibrary.wiley.com | Roman Marte |Robert Hofmann
References 1Marte, R.; Hofmann, R. (2020) Creeping large-scale landslides – Characterisation and assessment of safety. Geomechanics and Tunnelling 13, No. 1, pp. 32–51. https://doi.org/10.1002/geot.201900070 2Hofmann, R.; Sausgruber, J. T. (2017) Creep behaviour and remediation concept for a deep-seated landslide, Navistal, Tyrol, Austria. Geomechanics and Tunnelling 10, No. 1. pp. 59–73. https://doi.org/10.1002/geot.201600066 3Leroueil, S.
-
Aug 12, 2024 |
onlinelibrary.wiley.com | Andreas Koch |Simon Berger |Robert Hofmann |Philipp Jansen
References 1Gariano, S. L.; Guzzetti, F. (2016) Landslides in a changing climate. Earth-Science Reviews 162, pp. 227–252. 2Gobiet, A.; Kotlarski, S.; Beniston, M.; Heinrich, G.; Rajczak, J.; Stoffel, M. (2014) 21st century climate change in the European Alps – A review. Science of the Total Environment 493, pp. 1138–1151. 3Hungr, O.; Leroueil, S.; Picarelli, L. (2014) The Varnes classification of landslide types, an update. Landslides 11, No. 2, pp. 167–194.
-
Apr 11, 2024 |
dialnet.unirioja.es | Robert Hofmann |Johannes Müller |Nils Müller-Scheessel
ResumenExplanations for the emergence and abandonment of the Chalcolithic Trypillia mega-sites have long been debated. Here, the authors use Gini coefficients based on the sizes of approximately 7000 houses at 38 Trypillia sites to assess inequality between households as a factor in the rise and/or demise of these settlements. The results indicate temporarily reduced social inequality at mega-sites.
-
Feb 28, 2024 |
cambridge.org | Robert Hofmann |Nils Müller-Scheeßel |Johannes Müller
Last updated 09/07/24: Online ordering is currently unavailable due to technical issues. We apologise for any delays responding to customers while we resolve this.
-
Aug 21, 2023 |
vice.com | Robert Hofmann
Μεταξύ Ιουνίου και Δεκεμβρίου 2022, 61 εταιρείες στο Ηνωμένο Βασίλειο έκαναν ένα ριζοσπαστικό πείραμα: έδωσαν στους υπαλλήλους την επιλογή να μειώσουν την εργάσιμη εβδομάδα τους, σε τέσσερις ημέρες. Διοργανώθηκε από τη ΜΚΟ 4 Day Week Global και έδειξε ότι η συντριπτική πλειονότητα των εταιρειών δεν ανέφερε καμία αλλαγή στην επιχειρηματική απόδοση και την παραγωγικότητα.
Try JournoFinder For Free
Search and contact over 1M+ journalist profiles, browse 100M+ articles, and unlock powerful PR tools.
Start Your 7-Day Free Trial →