Ground Engineering
GE offers a combination of reliable reporting, insightful news analysis, unique features, and regular detailed supplements that provide technical insights. This ensures you stay informed about all the latest developments in the market.
Outlet metrics
Global
#812856
United Kingdom
#105585
Science and Education/Science and Education
#375
Articles
-
3 days ago |
geplus.co.uk | Thames Menteth
A cut-and-cover tunnel at Bourn Airfield on East West Rail’s proposed Bedford to Cambridge section faces site constraints but is the “right engineering solution”, the company’s integration director has said. The 1.5km long cut-and-cover tunnel would pass beneath the A428 and the proposed Bourn Airfield development and Highfields Road. The railway would drop into a cutting to enter the tunnel east of Cambourne station and Knapwell Wood Road.
-
3 days ago |
geplus.co.uk | Thames Menteth
Hampshire County Council has appointed six firms to its £4M geotechnical and geoenvironmental framework for 2025-2029. The chosen companies are TFW Group, A2 Site Investigation, Land Science, Ridge and Partners, Groundsolve and Ian Farmer Associates.
-
4 days ago |
geplus.co.uk | Thames Menteth
A market survey has been launched for suppliers interested in being part of the next phase of site investigations on the European Organisation for Nuclear Research’s (Cern’s) Future Circular Collider (FCC) project. The contracting authority published the prior information notice on 6 May.
-
4 days ago |
geplus.co.uk | Thames Menteth
Fugro has been awarded a contract to perform geotechnical surveys for the eastern array of the Dogger Bank South (DBS) offshore wind farms. The DBS scheme led by RWE and Masdar aims to develop one of the UK's most powerful offshore wind energy projects. The investigations will provide data on subsurface conditions at planned locations of wind turbines, inter-array cable routes and platform foundations, directly informing the design of the wind farms.
-
1 week ago |
geplus.co.uk | Thames Menteth
The main section of the Brenner Base tunnel on the Italian side is now 95% completed after a tunnel boring machine (TBM) finished a tricky drive beneath the Alps. TBM Flavia has ended its journey on the western tunnel of the Mules 2–3 lot, the biggest lot on the £13.2bn Brenner Base tunnel project.
Ground Engineering journalists
Contact details
Address
123 Example Street
City, Country 12345
Phone
+1 (555) 123-4567
Website
https://geplus.co.uk/Try JournoFinder For Free
Search and contact over 1M+ journalist profiles, browse 100M+ articles, and unlock powerful PR tools.
Start Your 7-Day Free Trial →