Energy Storage News

Energy Storage News

Your primary source for comprehensive news, insights, blogs, and additional information about the global energy storage sector.

International
English
Online/Digital

Outlet metrics

Domain Authority
55
Ranking

Global

#318996

United States

#197425

Heavy Industry and Engineering/Energy Industry

#592

Traffic sources
Monthly visitors

Articles

  • 3 days ago | energy-storage.news | George Heynes

    The Australian Energy Market Operator (AEMO) Services has launched the latest tender for long-duration energy storage (LDES) in New South Wales, seeking an indicative 1GW of projects. The tender, which opened on Friday (9 May), is the sixth of its kind and is being opened under the NSW Electricity Infrastructure Roadmap. The last tender saw 14GWh of LDES projects awarded Long-Term Energy Service Agreement (LTESA) contracts.

  • 3 days ago | energy-storage.news | George Heynes

    Developer ACEnergy has seen its 350MW/770MWh Little River battery energy storage system (BESS) fast-tracked by the Victoria government in Australia. The BESS is the latest project to be selected by the Victorian government to be fast-tracked via the Development Facilitation Program pathway.

  • 5 days ago | energy-storage.news | Cameron Murray

    Recent product announcements from major BESS suppliers shows a divergence from the 20-foot container as the only viable form factor, in a reversal of the trend seen up until the same point a year ago. A little under a year ago Energy-Storage.news looked at the reasons for a raft of new product announcements all designed around the 20-foot ISO container, 5MWh form factor.

  • 6 days ago | energy-storage.news | George Heynes

    ZEBRE, a joint venture (JV) between Taiwan’s HD Renewable Energy (HDRE) and Australian developer ZEN Energy, has acquired a 333MWh battery energy storage system (BESS) project in South Australia. In a deal worth around AU$80 million (US$51 million), the green energy investment and asset management platform, which was launched at the end of 2024, has secured the 111MW/330MWh 3-hour duration Templers BESS from ZEN Energy.

  • 1 week ago | energy-storage.news | Cameron Murray

    CATL has launched a 9MWh grid-scale BESS product which comprises two smaller units stacked on top of each other, which it said gets around weight challenges for transportation. The lithium-ion OEM launched the Tener Stack product at the ees Europe 2025 clean energy trade show and conference in Munich, Germany, yesterday (7 May) following which it gave a Q&A to media including Energy-Storage.news.

Energy Storage News journalists